top of page
Search
Martyn Kelly
Jun 18, 20214 min read
RENOVATING VITAL DUCTING AT A CANCER TREATMENT CENTRE
We had the pleasure of supporting Metro Rod HLP to complete an interesting project on behalf of the NHS bring to a successful conclusion.
61 views0 comments
Martyn Kelly
May 6, 20201 min read
REHABILITATING CAST IRON DRAINAGE AT BRISTOL AIRPORT
An innovative renovation operation of suspended cast iron drainage pipes utilised Picote milling
machines and brawoliner
63 views0 comments
Martyn Kelly
May 6, 20204 min read
DALROD UTILISES BRAWOLINER TO COMPLETE A CHALLENGING RENOVATION PROJECT NEAR ELY CATHEDRAL
The DALROD team worked tirelessly installing some three (3) Brawoliner sections using both inversion drum and scaffold tower inversion techn
35 views0 comments
Martyn Kelly
Mar 23, 20205 min read
BRAWOLINER HELPS KEEP COLLEGE BUILDINGS DAMP FREE
This liner was selected because it is designed to handle cross-sectional changes within a pipe being lined and so could easily accommodate t
24 views0 comments
Martyn Kelly
Feb 8, 20206 min read
BRAWOLINER® ELIMINATES EXCAVATION ON A CHALLENGING TORQUAY LINING PROJECT
The BRAWOLINER® 3D lining system was recently utilised on a very challenging sewer rehabilitation project which was part of the on-going £1
53 views0 comments
bottom of page